Bewag Berlin
Germany
|
Wood-incineration
Moabit/Klingenberg
|
Licence engineering
|
BIR
Bergen
Norway
|
New erection of waste
incineration
plant Bergen
90000 t/h
|
General contractor for the
steam-water-circuit and the auxiliary plants, 54 t/h, 400°C, 10,8 MWel
|
Alstom
Germany
|
Waste incineration
plant
Dürnohr
(200.000 t/a)
Waste incineration plant
Salzbergen (130.000
t/a)
|
General contractor for the
steam-water-circuit and the auxiliary plants
|
Alstom
France,
Alstom
Danmark
|
New erection of line 1 of the
special waste incineration
plant in Nyborg, Danmark
|
General contractor for the
boiler- and auxiliary plants, 34 t/h, 36 bar, 350°C
|
Recycling
company
Schulze
Wilmersdorf
Germany
|
Construction of a biomass-
power
station, 5 MWel
|
General contractor for
the
erection of the complete plant
Wood 50.000 t/a
Reference sheet
|
MVV Energie AG
Wicker
|
Construction of a biomass-
power
station, 15 MWel
|
General contractor
for the
erection of the complete plant Wood 90.000 t/a Reference sheet
|
Stadtwerke
Pforzheim
|
Construction of a biomass-
power
station, 15 MWel
|
General contractor for the erection of the complete plant, Design: 17.BlmSchV, Wood: A1-A4 Reference sheet
|
Stadtwerke
Leipzig GmbH |
Construction of a biomass
power
plant, 20 MWel
|
General contractor for the
erection of the complete plant, el. plant efficiency: 37 %, design: 13. BImSchV, virgin wood Reference sheet
|
|
|
|