Bayernoil Ingolstadt
|
ERN-Neustadt
|
Planning, delivery assembly
of EMST-conversion, new building construction
and refurbishment
|
BCA Bitterfeld Germany
|
Chloralkali membrane electrolysis
75,000 t/a chlorine
|
New plant/revamp Consortium
with Krupp Uhde
Construction planning, site management, construction
services for all disciplines
|
BSL Olefinvrebund
|
Chemical Plant and Ethylenstorage
|
Planning, construcion supervision,
inspection, concrete steel construction,
tube construction, EMR/-control technique,
welding technical supervision, material handling,
for various chemical new constructions and
ethylene storages
|
DOMO Neuchem Leuna
Germany
|
Polyester plant
|
Revamp
Field investigation, detail engineering
|
DOW Deutschland
Inc Werk Stade
|
Chemical Plant
|
Space Assingment study,
detail planning, plant-view-system für
various plants (solvents, POPG, Epoxy, ECU
I and II etc.)
|
DOW Deutschland
Inc. Werk Rheinmünster
|
Chemical Plant
|
Supreme construcion supervision
for various building and conversion projects
at Rhine Centre
|
EVC Schkopau
Germany
|
S-PVC plant
|
Licence: EVC
Cooperating with Bechtel
Basic and detail engineeirng, procurement,
supervision during erection stage
|
Holborn, Hamburg |
Benzolhydration Isomerization
FCC-facility
|
Project management and
engineering project- and construction supervision
for security concept
|
PCK
Raffinerie GmbH
Schwedt, Germany |
HF
Alkylation DESUS 2 |
Basic
engineering |
PCK Raffinerie
GmbH
Schwedt, Germany |
Hydrodesulfurization
plant FTK-2 |
Basic
engineering, permit engineering, detail engineering,
procurement, erection supervision, commissioning |
PCK Raffinerie
GmbH
Schwedt, Germany |
Hydrodesulfurization
plant DK-2 |
Basic
engineering, permit engineering, detail engineering,
procurement, erection supervision, commissioning |
Radici
Chimica Zeitz
Germany |
Olone
plant |
Know-how:
Radici Chimica S.p.A.
Basic and detail engineering, procurement,
erection supervision |
RWE-DEA
AG |
Chadless
Facility Fatty alcohol |
Increasing
the plant capacity and re-equipping for pellet
production, application of the official authorities,
basic and detail engineering, construction
management |
Shell |
Refinery |
Plant-
and pipeline planning, enhancement and conversion
in the fields, HDS, HTU, tanking area, platform,
Udes, cooling water- and fire extinguishing
system |
TLT
Leuna 2000 |
Refinery |
Construction
supervising and werlding monitoring at the
rigging of the Leuna 2000 refinery |
|
|
|