Signalling
 
Working during train operation can for example affect the time table. However by a professional execution these effects can be minimised considerably . METZ is able to execute construction stages and engagements in interlocking systems.

Scope of supply:

Conventional techniques (mechanical and electromechanical interlocking cabins, interlocking cabins with push-button geographical circuitry and track-diagram interlocking cabins)
Installation of new systems, conversion, reconstruction and retreat
Signals
Conventional switches, Electrical controlled local switch
Level crossings
Cable systems (copper and optical fibre)
Magazine train describer and train control
Track clearance signalling

Electronic interlockings
Outdoor equipment

Services:
Engineering
Project management
Site management
Installation
Supervision
Commissioning support
Maintenance and service

back
Leit- und Sicherungstechnik