|
Signalling |
|
Working
during train operation can for example affect the time
table. However by a professional execution these effects
can be minimised considerably . METZ is able to execute
construction stages and engagements in interlocking systems.
Scope of supply:
Conventional techniques (mechanical and electromechanical interlocking cabins, interlocking cabins with push-button geographical circuitry and track-diagram interlocking cabins)
|
|
• |
Installation of new systems, conversion,
reconstruction and retreat |
• |
Signals |
• |
Conventional switches, Electrical controlled local switch |
• |
Level crossings |
• |
Cable systems (copper and optical fibre)
|
• |
Magazine train describer and train control
|
• |
Track clearance signalling |
|
Electronic interlockings
Services:
|
|
• |
Engineering |
• |
Project management |
• |
Site management |
• |
Installation |
• |
Supervision |
• |
Commissioning support |
• |
Maintenance and service |
|
back |
|
|
|
|