ABB
AG |
Heating power plant Erfurt and Cottbus, Industrial power plant Leuna / Germany
|
Installation of I&C systems and electrotechnical instrumentation
|
Controlmatic GmbH |
Paper factory
Perl and Augsburg / Germany |
Installation of I&C systems and electrotechnical instrumentation
|
Westinghouse Reactor GmbH
|
Hahn-Meitner-Institut
Berlin / Germany |
Modernisation of the Generator
|
ABB AG
|
Unit 3, Power plant
Boxberg / Germany |
Power plant accident damage elimination
|
Alstom Power
|
Pumped storage hydro power plant, Hohenwarte / Germany
|
Management and site supervision, installation of control systems and electrotechnical instrumentation
|
Siemens AG
|
Deutsche Bank building
Frankfurt (Main) / Germany |
Installation of data systems
|
Siemens AG
|
Heating power plant
Baruth and Eisenberg / Germany |
Installation of I&C systems and electrotechnical instrumentation
|
Kvaerner Warnow
|
Kvaerner Warnow dockyard
Rostock / Germany |
Installation of the electrotechnical instrumentation in parts of the platform, part commissioning of the I&C systems (loop check)
|
Siemens AG
|
Pumped storage hydro power plant, Goldisthal / Germany |
Installation of high voltage cables |
ABB AG |
Unit 3 & 4, Power plant (2 x 65 MW), Benghazi Nord / Libya |
Installation of process control system Reference sheet |
ABB AG
|
Unit 1-4, Power plant (3 x 30 MW), Tobruk / Libya |
Installation of process control system Reference sheet |
ABB AG |
Pump station Benghazi 319 / Libya |
Installation of electrical noble parts and process control system Reference sheet |
|
|
|